3,000+ Access Points Upgraded Across 8 Warehouses During Peak Operations

We upgraded over 3,000 wireless access points across eight UK and Germany facilities in just 20 weeks, during peak Christmas operations.
Amazon case study
Warehouse access point image
Wireless access point image
Wireless Access Point image

I’m pleased to report that both the AP swap and removal operations have been successfully completed. I want to particularly commend DTE for their outstanding execution. Their professionalism and problem-solving capabilities were exemplary throughout the process, effectively handling all challenges that rose.

Abdelkrim Allaoua, Ops Tech IT

The Challenge

The client needed to upgrade more than 3,000 access points across eight warehouse facilities in the UK and Germany. With sites operating 24/7, downtime had to be minimised while completing the project within a tight five-week window over the peak Christmas period.

The Solution

DTE surveyed each facility to verify AP locations against supplied floorplans before checking, labelling and preparing every replacement AP.

Working closely with the client, installations were scheduled around planned shutdowns, with particular attention given to business-critical areas such as robotics floors.

🔹 IPAF-certified engineers completed AP replacements at a rate of approximately one every 20 minutes
🔹 Work was completed at varying heights using ladders and MEWPs
🔹 Each installation was photographed for verification
🔹 RAMS were developed alongside the client’s health and safety team
🔹 Detailed scheduling minimised disruption to warehouse operations

The Results

All AP replacements were completed safely, on time and within the five-week programme, despite restricted working hours, complex site access and peak-season operations.

Result Outcome
3,000 APs upgraded
Across eight operational facilities
On-Time Delivery
Completed within the five-week programme
Minimal Disruption
Downtime limited to 8 hours per site
Safe Delivery
Safety prioritised throughout all installations
Client Feedback
Highly positive feedback on delivery and professionalism

Explore more case studies

Case study image

Vehicle Integrity Scanning System Installation

Discover how DTE supported the installation of a vehicle integrity scanning system at a major UK logistics facility.
Case study image

Electrical & Data Installation for 12,000 sq.ft Office

Discover how DTE delivered a complete electrical and data installation for a 12,000 sq ft commercial office within a six-week programme.

Speak to a Specialist

Provide your details below, email info@dteuro.com or call +44 (0) 845 658 8810.