Electrical & Data Installation for 12,000 sq.ft Office

Discover how DTE delivered a complete electrical and data installation for a 12,000 sq ft commercial office within a six-week programme.
Case study image

The Challenge

The client required a complete electrical fit-out for a 12,000 sq ft commercial office, with the new workspace needing to be ready for employees to move into by a fixed deadline.

With the wider building remaining live and occupied throughout the project, careful planning and coordination were essential to minimise disruption while keeping the project on schedule.

Key challenges included:

🔹 Live Environment: Work needed to be completed while the wider building remained operational
🔹 Fixed Programme: The complete installation had to be delivered within six weeks
🔹 Project Coordination: Electrical and data works needed to be carefully coordinated alongside other trades
🔹 Complete Infrastructure: Power, data, lighting, containment and distribution were all required
🔹 Compliance: The electrical installation required comprehensive inspection, testing and certification

The Solution

DTE delivered the complete electrical and data infrastructure required for the new office environment, coordinating each stage of the installation around the wider fit-out programme.

The project included new electrical distribution and small power alongside structured data cabling connected back to the communications room. New LED lighting and intelligent controls were also installed to create an efficient, modern working environment.

DTE delivered:

🔹 120 power and data points
🔹 Structured data cabling and containment
🔹 New sub-mains and distribution boards
🔹 Small power throughout the office
🔹 LED lighting installation
🔹 Presence and daylight lighting controls
🔹 Cable tray, trunking and conduit
🔹 Electrical inspection, testing and certification to BS 7671

The Result

Result Outcome
Project Delivery
Completed within the six-week programme
Office Space
12,000 sq ft commercial fit-out
Power & Data
120 points installed throughout the workspace
Data Infrastructure
Structured cabling connected to the communications room
Electrical Infrastructure
New distribution, small power and containment installed
Compliance
Installation inspected, tested and certified to BS 7671
Operational Disruption
Works coordinated around a live, occupied building
Handover
Completed on programme with full certification

Explore more case studies

expert Warenvertrieb GmbH

Zero Wi-Fi Issues in First Year at Automated Fulfilment Centre

Discover how expert deployed AI-native WiFi across a 13,000m² automated warehouse, supporting robots, forklifts and 35,000 daily orders.
Hotel Royal Prisco

Seamless Wi-Fi Delivered Across Luxury Amalfi Coast Hotel

Discover how Hotel Royal Prisco improved guest Wi-Fi, hotel operations and network reliability with HPE Networking Instant On enterprise wireless solutions.

Speak to a Specialist

Provide your details below, email [email protected] or call +44 (0) 845 658 8810.